Hanoi has scheme on 8 rapid bus routes

0
444

In order to develop the infrastructure traffic network which is synchronous, sustainable, modern, accessible, convenient and meet the travel needs of people and be of environmental friendliness, the Prime Minister signed the
Decision No. 519/QD-TTg approving the transportation planning of Hanoi Capital by 2030, with a vision to 2050, to prioritize development of public traffic, especially the type of transportation with medium and large volume contributing to solving traffic congestion, traffic accidents in the areas of Hanoi Capital.
At the plan, the Prime Minister emphasizes that by 2020, bus still occupies a large proportion in the market share of public transport system in Hanoi Capital. The bus rapid transit (BTR): Planning 08 rapid bus routes including: (01) Kim Ma – Le Van Luong – Yen Nghia with the length of about 14 km; (02) Ngoc Hoi – Phu Xuyen (along old
national highway No.1) with the length of about 27 km; (3) Son Dong – Ba Vi with the length of about 20 km; (4) Phu
Dong – Bat Trang – Hung Yen with the length of about 15 km; (5) Gia Lam – Me Linh (Ring 3) with the length of about
30 km; (6) Me Linh – Son Dong – Yen Nghia – Ngoc Hoi – National Highway No.5 – Lac Dao (Ring 4) with the length
of about 53 km; (7) Ba La – Ung Hoa with the length of about 29 km; (8) Ung Hoa – Phu Xuyen with the length of about 17 km. Some urban railway routes may use the form of rapid bus when they have not yet been built such as
Route No.4, 8 and Route Son Tay – Hoa Lac – Xuan Mai. Upgrading and renovating the existing coach stations,
including: Nuoc Ngan, Giap Bat, Gia Lam, Thuong Tin; building new Xuan Mai coach station into the coach station
of grade 3 in combination with bus transit points. Building some coach stations in the medium-term period in the
areas: In the South (Southern Ring 3, Yen So ward, Hoang Mai district, area of about 3.4 ha); In the West (area of Southern National Highway No.32, Xuan Phuong, Tu Liem, area of about 3-5 ha); in the North (areas of Van Tri and Hai Bon, Dong Anh district, area of about 3-5 ha)….
This Decision takes effect on the signing date.

Nguồn: luatvietnam.vn